Compare engineering proposals
Compare the work offered before comparing the bottom-line fee.
Use the same comparison columns
Prepare a local worksheet with one column per proposal. Record the service, study level, buildings/elements, sampling, credential, access/testing, deliverables, meetings, schedule, reimbursables and exclusions. Use unknown when a proposal does not say. This website does not collect bids or identifiable property records.
Questions to carry forward
- Are all providers pricing the same service and inspection depth?
- What access, quantities or drawings have they assumed?
- Which fees are fixed, estimated, optional or excluded?
Separate a bundled amount
Ask for allocations across reserve study, SIRS, milestone phases, testing, design and administration. If no allocation exists, compare the bundle as a bundle. Do not attribute its whole value to one component or call several bids on one property independent market transactions.
Questions to carry forward
- Which services are included in the total?
- Are later phases optional or already authorized?
- Can excluded and reimbursable charges be itemized?
Prepare a board decision
Show the comparable scope, unresolved questions and proposed decision. The planning interval is discussion context, not a fairness test, approved quote or recommendation of a provider.
Questions to carry forward
- What needs clarification before selection?
- Which scope difference explains a fee difference?
- What must the board authorize and what remains open?
Resolve travel, occupied access and repeat visits
Before comparing professional fees, ask how site travel, occupied-unit access, common-area access and return visits are handled. Keep owner names, precise addresses, access codes and schedules in the association’s authorized systems; this public tool needs none of them. These are scope questions, not new collected fields or priced add-ons.
Questions to carry forward
- Is travel included, separately charged or limited to a stated service area?
- Who arranges occupied-unit access and what happens when a location is unavailable?
- Are lift/scaffold access, weather delays, repeat visits and reinspection included?
- Which inaccessible elements and assumptions will appear in the report?